|
|
£55,000
|
|
|
|
|
Pyramid Beach Resort
|
|
|
Hurghada, Al Bahr al Ahmar, Egypt
|
|
 |
|
Bedrooms: 2
Pyramids Beach is the perfect choice of development for anyone on a budget who is looking for affordable seaviews and beach access, plus all of the facitlities one would expect from a high class resort.
The major benefit of Pyramids Beach over other developments in the fast developing Al-Ahyaa district is its location - right opposite the El Noor public beach, which means that the majority of the apartments in the development have clear sea views and owners can be enjoying the golden sands and crystal blue waters of the Red Sea in a matter of seconds.
Consisting of 570 individual units built in two phases and offering a wide variety of unit sizes from studios right up to large three-bedroom apartments, all completed to European standards, there is sure to be the right size of accommodation here for you. And, with prices for the studios starting from a mere GBP17,800/EUR22,500, it's not going to break the bank either.
Location
Pyramids Beach occupies one of the best plots in the Al-Ahyaa district due to the fact that it is located right opposite the El Noor public beach, offering immediate beach access and uninterrupted sea views.
The fast-developing Al-Ahyaa district is centrally located just 10 minutes north of Hurghada international airport, the same distance from Hurghada town centre and is also only 10 minutes south of El Gouna with its 18-hole PGA golf course, marinas and many varied enertainment options.
A 40,000m2 shopping mall is planned just 250m from the development and extensive other entertainment and dining options will be sure to emerge as the area continues with its fast growth.
Finishing
Polished ceramic tiles throughout Tiling in bathrooms and kitchens Windows and doors installed throughout Rendered walls painted Electrical installation with power points and light switches Pre-installation for digital TV and sockets for telephone, television and data lines Fitted base units, stainless steel sink with mixer taps and worktop in kitchen area White porcelain sanitary fittings in bathroom (toilet, sinks and bath/shower) with mixer taps Fitted wardrobes
Completion
Phase One of Pyramids Beach is due for completion by winter 2009. Completion of Phase Two is scheduled for winter 2010.
Payment Schedule
10% reservation fee (fully refundable up until contract) 40% upon signature of contract 25% six months following signature of contract 25% upon completion
Enquire about this property
|
|
|